Second Wind Noble 6018 Manual de instalación

Busca en linea o descarga Manual de instalación para Filtros de aire Second Wind Noble 6018. Second Wind Noble 6018 Unit installation Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 10
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
Vista de pagina 0
1 2 3 4 5 6 7 8 9 10

Indice de contenidos

Pagina 2 - CAUTION

10 Noble Air Purification 6009 and 6018 units are mounted in the return or supply to accommodate most HVAC systems. The units install anywhere in the

Pagina 3

2 Product 2 Safety Procedures 2 Mounting Location 3 Tools 3 Installation 4 Lamp Replacement/Disposal And Parts List 5 Troubleshooting Warranty 6 6 &a

Pagina 4 - Service

3 1. Install the lamp where you have easy access. 2. Make sure before drilling into equipment that there is nothing in the way that would be damaged

Pagina 5

4 • The installation should be done by a qualified HVAC contractor. Unit must be installed in com-pliance with all national and local electrical and

Pagina 6

5 1. Place the supplied mounting template on the duct board at the desired location. Use duct tape to secure the template to the duct board. (Fig. A

Pagina 7

6 The Noble Air Ultraviolet Germicidal Lamp is designed for 9000-11,000 hours of continuous operation. After 9000 hours intensity of the lamp inside t

Pagina 8

7 If the unit does not work, check the following: Electrical Supply/Wiring—Verify that the electrical service is operating correctly. Ballast—If lam

Pagina 9 - Features and Benefits

8 All Noble Air Purification systems that are attached to your Heating, Ventilation and Air Conditioning System (HVAC) have a lifetime limited warrant

Pagina 10 - F and 400 fpm

9 Since the first ultraviolet irradiation system was used successfully in 1909, ultraviolet irradiation has had a 94 year performance history. Noble

Comentarios a estos manuales

Sin comentarios